PMS(Project Management System) Application icon

PMS(Project Management System) 2.2

5.3 MB / 1+ Downloads / Rating 5.0 - 1 reviews


See previous versions

PMS(Project Management System), developed and published by Wisepayy, has released its latest version, 2.2, on 2020-08-03. This app falls under the Tools category on the Google Play Store and has achieved over 50 installs. It currently holds an overall rating of 5.0, based on 1 reviews.

PMS(Project Management System) APK available on this page is compatible with all Android devices that meet the required specifications (Android 4.1+). It can also be installed on PC and Mac using an Android emulator such as Bluestacks, LDPlayer, and others.

Read More

App Screenshot

App Screenshot

App Details

Package name: com.anandtechs.pmsproject

Updated: 5 years ago

Developer Name: Wisepayy

Category: Tools

New features: Show more

App Permissions: Show more

Installation Instructions

This article outlines two straightforward methods for installing PMS(Project Management System) on PC Windows and Mac.

Using BlueStacks

  1. Download the APK/XAPK file from this page.
  2. Install BlueStacks by visiting http://bluestacks.com.
  3. Open the APK/XAPK file by double-clicking it. This action will launch BlueStacks and begin the application's installation. If the APK file does not automatically open with BlueStacks, right-click on it and select 'Open with...', then navigate to BlueStacks. Alternatively, you can drag-and-drop the APK file onto the BlueStacks home screen.
  4. Wait a few seconds for the installation to complete. Once done, the installed app will appear on the BlueStacks home screen. Click its icon to start using the application.

Using LDPlayer

  1. Download and install LDPlayer from https://www.ldplayer.net.
  2. Drag the APK/XAPK file directly into LDPlayer.

If you have any questions, please don't hesitate to contact us.

Previous Versions

PMS(Project Management System) 2.2
2020-08-03 / 5.3 MB / Android 4.1+

About this app

Project management system is used for all aspects of managing, monitoring, and controlling a project, including project planning, scheduling, and change management. Project management system is also provides a central knowledge base on project documentation.

New features

Add Chat functioning
Change UI Part

App Permissions

Allows applications to access information about networks.
Allows applications to open network sockets.
Required to be able to access the camera device.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to receive the ACTION_BOOT_COMPLETED that is broadcast after the system finishes booting.