MsProject Application icon

MsProject 1.0

2.2 MB / 0+ Downloads / Rating 1.0 - 1 reviews


See previous versions

MsProject, developed and published by MSCODE, has released its latest version, 1.0, on 2018-07-02. This app falls under the Productivity category on the Google Play Store and has achieved over 1 installs. It currently holds an overall rating of 1.0, based on 1 reviews.

MsProject APK available on this page is compatible with all Android devices that meet the required specifications (Android 4.4+). It can also be installed on PC and Mac using an Android emulator such as Bluestacks, LDPlayer, and others.

Read More

App Screenshot

App Screenshot

App Details

Package name: cl.mscode.msproject.msproject

Updated: 7 years ago

Developer Name: MSCODE

Category: Productivity

New features: Show more

App Permissions: Show more

Installation Instructions

This article outlines two straightforward methods for installing MsProject on PC Windows and Mac.

Using BlueStacks

  1. Download the APK/XAPK file from this page.
  2. Install BlueStacks by visiting http://bluestacks.com.
  3. Open the APK/XAPK file by double-clicking it. This action will launch BlueStacks and begin the application's installation. If the APK file does not automatically open with BlueStacks, right-click on it and select 'Open with...', then navigate to BlueStacks. Alternatively, you can drag-and-drop the APK file onto the BlueStacks home screen.
  4. Wait a few seconds for the installation to complete. Once done, the installed app will appear on the BlueStacks home screen. Click its icon to start using the application.

Using LDPlayer

  1. Download and install LDPlayer from https://www.ldplayer.net.
  2. Drag the APK/XAPK file directly into LDPlayer.

If you have any questions, please don't hesitate to contact us.

App Rating

1.0
Total 1 reviews

Previous Versions

MsProject 1.0
2018-07-02 / 2.2 MB / Android 4.4+

About this app

La gestión de proyectos supone el impulso, la planificación, la organización, el control y la evaluación de los recursos con el propósito de alcanzar un/os objetivo/s determinado/s. Hace unas semanas vimos en un post anterior la importancia de gestionar proyectos con destreza. Ya entonces apuntamos algunas características y funciones del gestor de proyectos. En esta ocasión profundizaremos en ello.

Antes de ver cuáles son las tareas del gestor de proyectos es necesario detenerse en el perfil competencial de este/a profesional.

New features

- Vista de proyectos.
- Vista de tareas por proyectos.
- Realizar tareas.

App Permissions

Allows applications to open network sockets.
Allows access to the list of accounts in the Accounts Service.
Allows an application to read the user's contacts data.