Download Smart Student

File Details

  • Version: 1.0.0
  • Add on: 2 months ago
  • File name: Smart Student-v1.0.0-ApksPC.com.apk
  • File size: 35.3 MB
  • File hash: 2e1cb8f30a32cd61e19de567b544a713

Installation Instructions

This article outlines two straightforward methods for installing Smart Student on PC Windows and Mac.

Using BlueStacks

  1. Download the APK/XAPK file from this page.
  2. Install BlueStacks by visiting http://bluestacks.com.
  3. Open the APK/XAPK file by double-clicking it. This action will launch BlueStacks and begin the application's installation. If the APK file does not automatically open with BlueStacks, right-click on it and select 'Open with...', then navigate to BlueStacks. Alternatively, you can drag-and-drop the APK file onto the BlueStacks home screen.
  4. Wait a few seconds for the installation to complete. Once done, the installed app will appear on the BlueStacks home screen. Click its icon to start using the application.

Using LDPlayer

  1. Download and install LDPlayer from https://www.ldplayer.net.
  2. Drag the APK/XAPK file directly into LDPlayer.

If you have any questions, please don't hesitate to contact us.

Previous Versions

Smart Student 1.0.0
2024-12-13 / 35.3 MB