File Details
- Version: 1.4.2
- Add on: 2 years ago
- File name: 山海星神-v1.4.2-ApksPC.com.apk
- File size: 63.5 MB
- File hash: 9c634ab1942ebd71ea503bc63128e355
Installation Instructions
This article outlines two straightforward methods for installing 山海星神 on PC Windows and Mac.
Using BlueStacks
- Download the APK/XAPK file from this page.
- Install BlueStacks by visiting http://bluestacks.com.
- Open the APK/XAPK file by double-clicking it. This action will launch BlueStacks and begin the application's installation. If the APK file does not automatically open with BlueStacks, right-click on it and select 'Open with...', then navigate to BlueStacks. Alternatively, you can drag-and-drop the APK file onto the BlueStacks home screen.
- Wait a few seconds for the installation to complete. Once done, the installed app will appear on the BlueStacks home screen. Click its icon to start using the application.
Using LDPlayer
- Download and install LDPlayer from https://www.ldplayer.net.
- Drag the APK/XAPK file directly into LDPlayer.
If you have any questions, please don't hesitate to contact us.
Previous Versions
山海星神 1.4.2
2023-01-23 / 63.5 MB