山海星神, developed and published by 火狗工房, has released its latest version, 1.4.2, on 2023-01-23. This app falls under the Role Playing category on the Google Play Store and has achieved over 5000 installs. It currently holds an overall rating of 3.3, based on 170 reviews.
山海星神 APK available on this page is compatible with all Android devices that meet the required specifications (Android 4.1+). It can also be installed on PC and Mac using an Android emulator such as Bluestacks, LDPlayer, and others.
Game Screenshot
Game Details
Package name: com.firedogstudio.msproject
Updated: 2 years ago
Developer Name: 火狗工房
Category: Role Playing
New features: Show more
App Permissions: Show more
Installation Instructions
This article outlines two straightforward methods for installing 山海星神 on PC Windows and Mac.
Using BlueStacks
- Download the APK/XAPK file from this page.
- Install BlueStacks by visiting http://bluestacks.com.
- Open the APK/XAPK file by double-clicking it. This action will launch BlueStacks and begin the application's installation. If the APK file does not automatically open with BlueStacks, right-click on it and select 'Open with...', then navigate to BlueStacks. Alternatively, you can drag-and-drop the APK file onto the BlueStacks home screen.
- Wait a few seconds for the installation to complete. Once done, the installed app will appear on the BlueStacks home screen. Click its icon to start using the application.
Using LDPlayer
- Download and install LDPlayer from https://www.ldplayer.net.
- Drag the APK/XAPK file directly into LDPlayer.
If you have any questions, please don't hesitate to contact us.
Game Rating
Reviews
1 ★, on 2019-03-14
Keep said connection fail since last night.
5 ★, on 2019-07-27
連線失敗,重新連線? 刚下载要玩就这样。 真遗憾 😞 给你五星吧🤗
1 ★, on 2018-02-26
。。
5 ★, on 2018-01-28
It wus more thin cool it wus allsum
Previous Versions
山海星神 1.4.2
2023-01-23 / 63.5 MB / Android 4.1+