About this app
Adana Metro (Turkish: Adana metrosu) is a rail rapid transit system extending 13.5 kilometers (8.4 mi) along a north-south corridor through Adana, with 13 stations. It can transport 21,600 passengers per hour per direction. The total travel time on the metro, end to end, takes 21 minutes, including all stops.
The rapid transit system for Adana was initiated in 1988 after requests from the mayor Aytaç Durak and the Çukurova University rector Mithat Özsan to the Ministry of Transportation. A feasibility report was completed on May 30, 1990, by the consortium of PMBI A.Ş. and Brinckerkoff Int.Inc. The report was approved by the State Planning Agency and the construction of the rapid transit system was included in the 1993 investment program. In 1996, the project was contracted to Adtranz-Alarko-ABB Electric Consortium for $US 340 million.
To accommodate the new residential developments along the project route and to better integrate northern and southern Adana, the Adana Metropolitan Municipality decided to make an amendment to the project plan by extending the line to southern Adana. The southernmost point of the initial project had been the D-400 state road. Amendments were approved by State Planning Agency in 1999 and the construction of the metro started on 28 January 1999.
Unexpected costs increases during the construction of the Metro led to the need for extra funding for the project. Metropolitan Municipality made a request to State Planning Agency for new funding, but the request was declined. As a result, construction of the Metro stopped in 2002. After 6 years, the Municipality was able to get approval for new funding of $US 194.2 million and construction resumed in 2008.
On 18 March 2009 the Metro was partially opened with services running between Hastane and Vilayet stations. After 3 months of free service, this section of the Metro was closed to service so that the connection with the section that was under construction could be completed.
The Adana Metro opened for full public service on 14 May 2010.
Adana Metro is a 13.9-kilometer (8.6 mi) long double track rail line, of which 3.5 kilometers (2.2 mi) is underground (in cut and cover tunnels), 2.5 kilometers (1.6 mi) is in trench, 5.3 kilometers (3.3 mi) is elevated, and 2.55 kilometers (1.58 mi) is at-grade.
The Metro runs from 6:00 am to 23:30 pm everyday, The metro is part of the Metropolitan Municipality Bus Department (ABBO) network where an adult fare costs 1 TL for Kentkart holders which allows a passenger to have up to one hour for a one-way trip. Several bus and dolmuş lines are connected to the stations.
The line starts from the metro-car depot west of the Hospital for Mental Health. Following Turgut Özal Boulevard, the line reaches Anadolu Lycee, then turns south and follows Alparslan Türkeş Boulevard, crosses TCDD rail tracks near the City Hall and enters Southern Adana passing the D-400 state road. It then heads to the west of the Kocavezir Commercial Center and the Hürriyet Police Station until it reaches the Seyhan River. Crossing the river just north of the Regülatör Bridge, the line heads north, again crossing the D-400 state road and ends next to Yüreğir Bus Terminal.
The Metro has total of 13 stations, of which 4 are underground, 5 are elevated and 4 are on the surface. All the stations are equipped with escalators and elevators for the disabled.
The Metro fleet consists of 36 Hyundai Eurotem LRV cars(Also used on tram line 4 in Istanbul), with each having the capacity for 311 passengers. Each train runs in 3 car sets The metro is fully secure and monitored by SCADA remote controlling system.
Adana Metro will be extended from Akıncılar to the Çu
This article uses material from the Wikipedia article Adana Metro(https://en.wikipedia.org/wiki/Adana_Metro), which is released under the Creative Commons Attribution-ShareAlike 3.0 Unported License